Monday, 14 December 2015

Production Log - Kieran Panchal 9652 and Joshua Manely 9645

30/11/15 - All location scouting carried out, using location scouting sheets to organise the information and data regarding the location.

3/12/15 - Completed two digipak mock up designs, using audience feedback to gauge preference and improvements.

9/12/15 - In this lesson we began to create our storyboard which allowed us to begin to gain a better understanding and visualisation on what and when will include things in our music video. Here we stated he intended time duration of the clip as well as the shot type with any camera movement and what the shot is of.

10/12/15 - Completed a Call sheet, allowing us to have a precise structure on shoot days, ensuring maximum organisation and productivity.

13/12/15 - Carried out test shoots with actor, experimenting with shot types, camera movement and slow motion.

 14/12/15 - We then edited the clips together to get an idea of what type of colour grading to use as well as what rate of slow motion looks best. We preferred a blue colour scheme to gain a cold gritty mood and we also found that the slow motion in 50 frames per second looked most effective.

14/12/15 - We also adapted the soundtrack of our product due to the fact that the original is 9 minutes long. Here we cut out certain repeated sections in Logic Pro X and applied fades in order to make it seamless.

15/12/15 - Visited the location and primed the location by general tidying and preparation. Carried out a second test shoot where we set up the set with our purchased props. We experimented with depth of field and potential shots which we could use in regards to the actor and also different aspects of the camp.

16/12/15 - Created a site plan in order to aid logistics and practicalities of shooting on the day.

17/12/15 - Our talent Hayden Miller signed our talent release document which agrees to all of the conditions of the shoot and is willing to participate as a talent on all of our planned shoot days.

21/12/15 - Carried out shoot one and completed the first half of the narrative based content

23/12/15 - Carried out shoot two to finish the filming of the narrative content.

2/1/16 - Created a range of poster/advertisements for the production.

8/1/16 - Carried out third shoot to begin to filming of the performance aspect of the video.

9/1/16 - Began working on the first edit, using the Premiere Pro software. This was done after reviewing the footage and making decisions on which shots to include in our edit and which shots were less successful.

12/1/16 - Edited a short 'teaser trailer' highlighting some of the stand out moments from the shooting so far. This was distributed via the Facebook page to create some interest and excitement around our production.

17/1/16 - Continued working on the first edit in order to form a rough cut.

18/1/16 - Completed a rough cut in order to gain feedback for the final edit.

19/1/16 - Carried out a focus group in order to gauge feedback on our product. This critical process would aid us in editing the final cut in line with the wants of the audience.

25/1/16 - Using the rough cut as a template, we commenced with editing the final cut of the music video using Premiere Pro.

30/2/16 - Commenced with editing using Premiere Pro, ensuring to consider audience feedback and referring back to our plans/keeping our overall goal in mind.

7/2/16 - Commenced with editing using Premiere Pro, ensuring to consider audience feedback and referring back to our plans/keeping our overall goal in mind.

15/2/16 - Commenced with editing using Premiere Pro, ensuring to consider audience feedback and referring back to our plans/keeping our overall goal in mind.

16/2/16 - Commenced with editing using Premiere Pro, ensuring to consider audience feedback and referring back to our plans/keeping our overall goal in mind.

22/2/16 - Commenced with editing using Premiere Pro, ensuring to consider audience feedback and referring back to our plans/keeping our overall goal in mind.

22/2/16 - Organised a screening to the class, where the audience could give us any final feedback before finalising the cut.

1/03/16 - Selected a range of final images and fonts that could be used in the production of ancillary tasks.

10/03/16 - Selected the main images to be used. Began to edit these images for the use, using Adobe Photoshop to create different tones and  styles to give the images different meanings as a background for the advert.

17/03/16 - Designed text using the previously selected fonts, and placed this on the adverts using Adobe inDesign to aid in the layout accuracy. - The adverts were completed later during this session.

30/03/16 - Began working on the album digipak, using the previously selected images and the same fonts used within the advert production to ensure continuity. During this session, the images were edited and placed within the Digipak template.

1/04/16 - The digipak design was completed, with the appropriate text placed accordingly using Adobe inDesign

5/04/16 - Created a booklet using Adobe Photoshop that could be found in the digipak, using various images from the shoot and previously used fonts to ensure continuity.

18/04/16 - Created an online poll asking our target audience the preferences of the group's ancillary tasks, using an online poll platform.

18/04/16 - Collated the results (qualitative and quantitative feedback) from the poll and found that my designs were preferred.



COLOUR/SLOW MO TEST SHOOT - Kieran Panchal 9652



This shoot gave us the opportunity to test the performance aspect of our music video. By filming our drummer - Hayden play Festival, we could visualise exactly how the performance looked on screen. As well as this, we set out to experiment with the types of emotions that the character would possess, and this practice shoot allowed us to carefully craft this until it was in line with the preferences of the director.  The other main outcome of this test shoot was to test the camera's ability to shoot slow motion sequences. During this test shoot, we experimented with shooting at different rates of frames shot per second, and found that 60fps gave us the best outcome for a smooth slow motion shot. When editing the test shots, we tested different speed rates also and found that slowing the footage shot at 60fps to a 50% speed gave us the smoothest result.

Whilst editing this, we also experimented roughly with colour to aid our familiarity with the software, however, we understood that this would not be wholly transferrable into our final piece due to the differences in the setting.

Thursday, 10 December 2015

Call List - Kieran Panchal 9652

Call List

Day 1

6am - Arrive at Kieran's house to pack equipment
6.30am - Leave heading to Carthagena Fisheries, EN10 6TA
7am - Arrive at Carthagena Fisheries Car Park
7.15am - All equipment transported to main location
7.30am - Call Hayden for make up and costume application/simultaneously set up camera equipment to begin shoot at 8.30am
8.30am - Call Hayden's Dog to complete all of his shooting as soon as possible
10.30am - Call Hayden to begin camp scenes
12pm - Call Hayden to begin camp exterior scenes
2pm - Call Hayden to begin drumming scenes

Day 2

7am - Arrive at Carthagena Fisheries Car Park
7.30am - Call Hayden for make up and costume application/simultaneously set up camera equipment to begin shoot at 8.30am
8.30am - Continue with any shooting not yet carried out the previous day/additional shooting
2pm - Call Hayden to continue drumming scenes.





Plans For Shooting - Kieran Panchal 9652 and Joshua Manley 9645

Plans For Shooting

Dates: 21/12/15 & 23/12/15

Logistics


  • Josh & Crew arrive at Kieran's house for 6am
  • Assemble all equipment/props in car and leave for 6.30am for Carthagena Fishery, EN10 6TA for 7am. Main actor to meet at the location, due to the close proximity of it to his house. This is shorter distance would also be more suitable for the transportation of the actor's dog, who is also appearing in the film. (Key is needed to get through the main gate)
  • Car parking is available close to the location to allow for the easy transportation of equipment.
  • In the case of an emergency we will use the car park as a checkpoint and will assemble here, before making our way to the public footpath past Carthagena Lock.
Costume, Hair and Make-up Requirements

The make up will be applied and carried out by Josh Manley. The make up equipment required is as follows:
  • Watercolour paints (for coloration)
  • Liquid Latex (for texture)
  • Tissue Paper (for texture)
  • Mud (for texture/colour)
All of these materials are accessible/ have already been purchased. We will ensure to bring these on the day of the shoot. We will carry out various make up tests prior to the shoot days. We will also ensure to photograph the actor's face excessively on the first day of the shoot after the make up has been applied. This will allow us to ensure that we match the make up on the day of the second shoot to that of the first shoot, in order to maintain continuity throughout the piece.

In terms of costume, this will be minimal, due to the narrative, context of the piece and the underlying messages that we are trying to present. The actor will simply just be wearing underclothes, all of which are already owned by us. He will ensure that he wears these on the day under his casual clothing to ensure ease and simplicity during the costume change.

Properties

We will be including the following in our music video shoot:
  • Smoke Bombs
  • Compass
  • Tent
  • Tree Stump
  • Bandages
  • Socks
  • Rocks
  • Wood
  • Drum Kit
  • Sticks
  • Cooking Utensils
  • Fake Blood
  • Fire
  • Animal Skins
  • Food Containers
  • Cigarettes
  • Lighter
  • Drums
  • Bones/Carcasses
Further items needed: 
  • Wheel barrow for transportation
  • Food and Water Supplies
  • Filming Equipment  - 2 Cameras (Canon70D, Canon 600D) - Lenses (Canon 24-105 USM L Lens, Canon 50mm prime Lens, Canon 35-70mm Zoom Lens, Canon 70-300mm Zoom Lens) - Filters (UV, Hexagonal) - 2x Tripods, 1x Camera Slider, 1x Light Reflector
All of the properties above have been purchased or are available to us on the day of the shoot and we will ensure to arrange them all the day before.

Lighting Requirements

Throughout the entirety of the shoot we will be utilising natural light only, as the entirety of the shoot will be in daylight hours. We have purchased a 80cm diameter gold and silver photographic reflector to allow us to harness and disperse this natural light and use it to our advantage where possible.

Shot Types

In our music video, we plan to use a range of shot types including Extreme Close Ups, Close Ups, Mid Shots, Long Shots, Extreme Long Shots, including a variety of camera movements such as tilts, zooms, pans and slides. We will ensure to practise these extensively prior to the shoot to ensure that our technical skills are as good as possible.

Further Location Scouting - Kieran Panchal 9652 and Joshua Manley 9645

After carrying out extensive initial location scoutings, we decided to change our approach with the search.  After contacting various location hire agencies around London, we found that logistically and financially many of these desirable locations were not viable. In response to this, we decided to alter the parameters of our search for our location, and we concluded that it would be more manageable and logical to search more locally, with the intention to find locations with lower costs. After another group meeting that involved thinking of ideas for locations locally, we carried out a location recce at the following locations.

The Gravel Works, Carthegena Fishery, EN10 2TA
Map Co-ordinates: 51.748811, -0.001140














This location was formerly a sand and gravel works, an area where gravel was extracted when the surrounding gravel-pits (now fishing lakes) were originally dug around the 1950s (the image below shows the area when it was an active gravel extraction works). After receiving the go-ahead to visit the location, we carried out a location recce, which allowed us to extensively scout the area and subsequently gauge how suitable it would be as a setting for our music video.

From doing this, we found that the area had a very run-down, gritty feel to it, and there was a strong sense of abandonment, as it appears that the area has been left untouched since the withdrawal of the gravel extraction machinery many years ago. We felt that this suited the temporal and spacial context of our narrative, as it reinforced the post-apocalyptic theme. In addition to this, the location is logistically workable and as a setting, the abundance of space would give us great versatility and flexibility when making decisions on where to shoot, and with building small sets. This is private land so here, we are guaranteed to remain undisturbed by pedestrians and passers-by. We have successfully secured permission to use this location, free of charge, for as many days as necessary, making this more practical still as it will give us the opportunity to re-shoot/gain further footage if the need to do this should arise.

The images above were carefully crafted in order to provide us with the greatest view of as many aspects of the location possible that were relevant to our plot. We took these photographs as we felt that they would be particularly insightful and assisting in the storyboarding process. The photographs where we are included within the shot are also very useful as they allowed us to get a greater idea of the proportional size of the location.


Epping Forest is an area of ancient woodland in South-East England, straddling the border between North-East London and Essex. It is a former royal forest, and is managed by the City of London Corporation. It contains areas of woodland, grassland, heath, rivers, bogs and ponds, and most of it is a Site of Scientific Interest.






Epping forest provides a lot of potential for our music video. The natural landscape can work very effectively for our product as in the winter it appear much more gritty and bleak which can relate to our narrative being placed in a post apocalyptic world. It has many avenues in which we could explore which could allow us to have a wide range of experimentation in regards to shots. In the winter the leafless tree would work very well in showing a run down deteriorated location. Also we came across many areas of the forest which were suitable to set up the set which would supply a very realistic scene. There were areas where remains of rivers where and also we came across piles of logs which would work very with the layout of our camp style set. However, we are aiming to create a small fire for our music video which would potentially put us and others at risk due to the forest environment. So this is factor we have to contemplate when deciding on a location. Also we discovered that to allow us to film at the location we would have to get a filming licence with City of London which could potentially take away a lot of our budget in which we would prefer to spend on other areas of our production.